Main terminal specifications
• Discharging of petroleum products from rail-road tank cars is carried out on the 1st railway overpass with the general discharging front of 8 wagons.
• Storage of petroleum products is carried out in a shore tanks with a total capacity of 12,200 m3, divided into 2 groups of tanks that are used to store various types of petroleum products.
• Loading of road trucks – one ramp with possibility to load up to 100 m3 per hour of light petroleum products.
• Pumping of petroleum products during rail-road tanks discharging, loading onto tankers, as well as internal pumping between shore tanks, is carried out by technological pipelines with 3 stationary and 1 mobile pumping stations, where different types of pumps (centrifugal, screw, etc.) are used.
• Heat supply of the terminal is provided by the terminal's own modular boiler house with a total productivity of 8.5 tones of steam per hour.
•Boiler house: boiler E-1/9 - G - was put into operation in 2001; boiler E-1/9 - D - was put into operation in 2001; deaeration system Chemical water treatment system
• Electricity supply to the terminal is provided from the public network through power substations in Reni port
• Water supply of the terminal is carried out from the public network through a steel water pipeline 200 mm
• Fire extinguishing system of the terminal is carried out from the fire water supply system of Reni port
• Quality control of petroleum products is carried out by an independent surveyor
OUR TEAM
consists of strong professionals in the field of logistics and transshipment, as well as in other relevant areas. We make every effort to meet our client's needs and find a balance between quality and capacity of our services. Through the efforts of our team and our partners we organise a demanding transshipment process to provide end consumers with professional service. With extensive experience and knowledge of the market, we know how to meet your needs by organising efficient supply chains!